State profile · Ohio

Ohio oversize and overweight permits

Every figure here carries the Ohio document behind it.

7 source documents on fileoldest revision 2001-06-29last retrieved 2026-10-179 escort rules in effectNo source conflicts on fileFree · no account needed

The Ohio answer

Legal limits

Width
8'6" · caveat ↓rev. · read
Height
13'6" · caveat ↓rev. · read
Overall length
The state publishes none
Gross weight
80,000 lb · caveat ↓rev. · read

First escort trigger

Width
13' or morerev. · read
Height
14'6" or morerev. · read
Length
over 90'rev. · read
Rear overhang
No trigger published
Gross weight
No trigger published

What the paper costs

Single-trip base
$20 · caveat ↓rev. · read
Transaction / card
None published · caveat ↓rev. · read
How overweight is priced
Graduated weight bandsrev. · read
Superload above
120,000 lb and up · caveat ↓undated document · read

The short version: a Ohio single-trip permit starts at $20 before bands, overweight and the transaction charge; an escort is first required at 13' or more wide; and the load becomes a superload at over 120,000 lb. Everything below carries the Ohio document it came from, that document's own revision date, and the date we read it.

Corridor

1. Where the load goes next

The jurisdictions this one borders, each chip carrying the fact that decides whether that crossing is the expensive one — so the row is itself a small comparison. A multi-state lane is the actual job, and from here it is one click per state rather than a return to an alphabetical index.

Compare Ohio with its neighbours →

Escort ladder

3. The Ohio escort ladder

Not one number per dimension — the whole staircase. Each row is a condition the state actually publishes, what it requires when that condition holds, and the clause it comes from. Where a rule requires escorts and the source states no number, the row says that in the source's own words rather than reporting no requirement.

WhenWhat is requiredSource
the move runs on a named segment (OH:ohio-turnpike-i80-i90) and width over 13' or overall length over 160'
The count is settled; the source does not say front or rear — at least 1. Published as: “Ohio Turnpike and Infrastructure Commission, Special Hauling Permit Information rev. 2018-08-07, Item 7: "a Patrol escort will be required for all vehicles over 13 Feet in width and all vehicles over 160 Feet in length." The Commission's fee schedule rev. 2019-03-26 bills it "for each Patrolman … $60.00/hr", and OAC 5537-3-05 (eff. 2023-09-01) states the same rate as "sixty dollars per hour".”
Item 7: "a Patrol escort will be required for…rev. · read
width over 13' and width from 13' to 14'6"
1 certified escort
escort thresholds; height-sensing device; for…rev. · read
height over 14'6" and height from 14'6" to 14'10"
1 certified escort1 in frontHeight pole required
escort thresholds; height-sensing device; for…rev. · read
at least 2 of: another rule already applies (oh-length-over-90); another rule already applies (oh-width-over-13) or another rule already applies (oh-width-over-14-6); another rule already applies (oh-height-over-14-6) or another rule already applies (oh-height-over-14-10)
2 certified escorts1 in front1 behind
escort thresholds; height-sensing device; for…rev. · read
width over 14'6"
2 certified escorts1 in front1 behind
escort thresholds; height-sensing device; for…rev. · read
height over 14'10"
2 certified escorts1 in front1 behindHeight pole required
escort thresholds; height-sensing device; for…rev. · read
width over 16'
Escorts required; the source states no number. Published as: “a law enforcement escort is required in addition to private escorts”Cannot be reduced to a number: Ohio requires a law-enforcement escort "in addition to private escorts" on any load over 16 ft wide, but publishes no officer count, no position and no hourly or per-mile rate. The police-escort cost cannot be quoted and must be arranged and priced through ODOT.
single-trip fee tables; superload definition;…undated document · read
overall length over 90'
1 certified escort1 behind
escort thresholds; height-sensing device; for…rev. · read

The first trigger in each dimension

MeasurementFirst escort triggerFirst police escort trigger
Width13' or morerev. · read None published
Height14'6" or morerev. · read None published
Lengthover 90'rev. · read None published
Rear overhangNone publishedNone published
Gross weightNone publishedNone published
The same rules restated in plain sentences9 rules

Compare all states →

Permit fees

4. Ohio single-trip permit fees

ChargeAmount
Single-trip base$20rev. · read "All permit application processing fees consist of the basic processing charge of twenty dollars plus each unit of surcharge that is applicable to that movement."
Transaction / cardNone publishedrev. · read Ohio publishes no percentage surcharge: the fee "consist[s] of the basic processing charge of twenty dollars plus each unit of surcharge". UNKNOWN, recorded and not filled in: the rule also says "At the discretion of the director, a third party processor service may be utilized for credit card transactions" and publishes no processor fee amount or percentage. Any card fee is that processor's, not Ohio's.
Route analysis reviewNot yet covered
Route with no bridgesNot yet covered

Dimension bands

BandFee
over legal width, up to 14 ft wide and 14 ft 6 in high — $55 outbound surcharge$55rev. · read OAC 5501:2-1-05(A)(1)(a): "Overall width up to fourteen feet and/or overall height up to fourteen feet six inches: (i) Outbound trip: fifty-five dollars". With the $20 basic charge this reproduces ODOT's published "OS Only $75". Return trip is $35 and is not modelled — this engine prices one-way single trips.
over legal height, up to 14 ft 6 in high, at or under legal width — $55 outbound surcharge$55rev. · read The same $55 band reached on height alone. Bounded at legal width so it cannot also match a load already covered by the width row above — two matching rows with different bounds would be read by the resolver as two sources disagreeing, which they are not.
over 14 ft wide — $125 outbound surcharge$125rev. · read OAC 5501:2-1-05(A)(1)(b): "Overall width in excess of fourteen feet and/or overall height in excess of fourteen feet, six inches: (i) Outbound trip: one hundred twenty-five dollars". Note that a load in this band is ALSO a superload under ODOT's definition, so in practice the engine refuses to price it and this row exists for completeness.
over 14 ft 6 in high, at or under 14 ft wide — $125 outbound surcharge$125rev. · read The same $125 band reached on height alone, bounded at 14 ft wide for the same mutual-exclusivity reason as the $55 pair.

Compare all states →

Overweight model

5. How Ohio prices overweight

Graduated weight bands. OAC 5501:2-1-05 sets a flat $125 outbound overweight surcharge up to 120,000 lb gross. Above 120,000 lb the rule charges "one hundred twenty-five dollars plus four cents per ton over sixty tons, per mile traveled" — a distance term carried on the heavy band itself, so the band prices when in-state mileage is supplied and is reported unpriced when it is not. The MODEL is still `bands` and not `perMile`: the schedule below 120,000 lb is flat in both weight and distance, and declaring the whole state per-mile would misprice every ordinary Ohio permit.

Ohio Adm. Code 5501:2-1-05 — Permit application processing fees — rev. · read

The bands, as published

Gross weightAxlesFeeSource
80,001 lb – 120,000 lb any $125 (A) basic charge and surcharge units; (A)(1) …rev. · read
120,001 lb and up any $125 (A) basic charge and surcharge units; (A)(1) …rev. · read
Seasonal posting

6. Ohio seasonal posting windows

A permit priced against an unposted-road assumption in March is simply wrong, and wrong in the expensive direction. This is the window we watch, the basis for that window in the state's own orders or statute, and the authority that posts it.

Seasonal posting

Programme
Local roads only — the state system is not postedODOT does not impose spring weight restrictions on the state highway system. Ohio frost laws are posted by county engineers and township trustees on local roads, road by road, with no statewide list. Check the county engineer for the specific local roads on your route.
Issuing authority
OAC 5501:2-1-05 — ODOT special hauling permitsOhio Department of Transportation

The live Ohio restriction picture, with the date we last read the bulletin →

Superload

7. Ohio's superload threshold

Above one of these, the state stops issuing over the counter and prices the move after an engineering review.

TriggerThreshold
Gross weightover 120,000 lbundated document · read "Superload - any vehicle or combination or load having a gross weight in excess of 120,000 lbs." — exclusive, so a load at exactly 120,000 lb is still an ordinary permit and is priced by the $125 band.
Widthover 14'undated document · read "overall width in excess of 14'-0\""
Heightover 14'6"undated document · read "overall height in excess of 14'-6\""
LengthNone published
Short axle spacingNot yet covered

Compare all states →

Route survey

8. Route survey and bridge review

The dimensions at which Ohio triggers a physical route inspection or an engineering review, and what the agency charges to review it.

MeasurementInspection / review trigger
WidthNot yet covered
HeightNot yet covered
LengthNot yet covered
Police escorts

9. Police escorts

Ohio State Highway Patrol (for the Ohio Turnpike and Infrastructure Commission) publishes a rate. One officer costs at least an amount the schedule does not let us compute before mileage.

Ohio Adm. Code 5537-3-05 — Permits for the movement of overweight and/or overdimensional vehicles (Ohio Turnpike) — rev. · read

What the schedule does not price4 items
  • NO MINIMUM CALLOUT AND NO TIME BASIS ARE PUBLISHED. Neither OAC 5537-3-05 nor the Commission's fee schedule rev. 2019-03-26 states a minimum number of billable hours, and neither says whether the hour runs portal-to-portal from the post or only while the officer is on the move. The Commission's instruction is to contact permitting directly. The figure on the quote is this product's own four-hour minimum over the Commission's rate, never a published floor.
  • ODOT PUBLISHES NO RATE FOR ITS OWN ESCORT, AND THE $60.00/HR MUST NOT BE APPLIED TO ONE. Ohio requires a law-enforcement escort in addition to private escorts over 16 ft wide on the STATE HIGHWAY system (escort rule `oh-police-over-16-wide`, OAC chapter 5501 and ODOT's Operational Guide) and publishes no officer count, no position and no hourly or per-mile rate for it. The sixty dollars an hour here is the Turnpike Commission's fee under OAC chapter 5537 and the authority of ORC 5537.04 and 5537.16; it is cited to the Turnpike and `triggeringEscortRuleIds` names only the Turnpike rule. The ODOT trigger is in any case unreachable inside this product's 16 ft width envelope.
  • THE PERMIT SHEET'S OTHER CHARGES ARE NOT ESCORT COSTS AND ARE NOT HERE. The Commission's rev. 2019-03-26 schedule also carries a $25 over-dimensional permit, a $135 overweight permit to 120,000 lb, $0.04 per ton-mile above 120,000 lb, and $50 for toll-plaza drive-up processing. Those are permit and processing fees for the Turnpike, not officer time, and they belong to the permit side of the engine rather than to this rate.
  • THE ESCORT MUST BE ARRANGED A WEEK AHEAD. "Applications for loads requiring an OSHP escort must be made 1 week in advance" (Special Hauling Permit Information, rev. 2018-08-07). That is a lead time rather than a charge, but it constrains when a Turnpike move can be booked and no late-request surcharge is published.

Compare all states →

Travel restrictions

10. When you can move it

Holiday, curfew and night-travel windows are not yet encoded for Ohio. The seasonal picture — which is a different question — is in section 6 above.

Why those windows are absent rather than estimated

They are not guessed at here. What we do publish is the seasonal weight-restriction picture, with the date we last read each state's own bulletin — a curfew invented from a plausible pattern is worth less than an honest gap, because a reader cannot tell the two apart on the page.

Who issues it

11. Permit office

The agency behind each figure above is linked from that figure. We publish no per-state permit-office phone number.

Why there is no phone number here

We are not publishing per-state permit-office phone numbers yet, and the reason is worth stating: the two seed lists available for them are both demonstrably stale — the federal one gives two different states the same phone number — and a wrong number on a page like this costs somebody a morning. The agency behind each figure above is linked from that figure, which is the part we can stand behind today.

Scope

12. What this does not include

Named rather than gestured at, because each of these can exceed the permit itself. Every item is listed; open one for why it is excluded.

Line haul, fuel and driver time

This is a permit fee, not a freight rate.

Civilian pilot car rates

We hold no rate data, and the two commercial sites that publish market rates disagree by nearly a factor of two on the same service.

Route-survey engineering

The agency's review fee is shown where the state publishes one; the engineer's own fee is a private cost with no schedule.

Bonds and escrow

Set per move by the agency, and in at least one state the escort is billed at actual cost against it.

Utility coordination and line lifts

Arranged with each utility, priced by each utility.

Second-issuer permits

A toll, bridge or city authority inside the same state issues its own permit, and a state total that omits it is missing a whole permit.

Need a pilot car for this lane? Browse the pilot car & escort directory.

Price a lane through Ohio →

Provenance

13. Every source behind this page (7)

Every document behind Ohio7 sources
Common questions

Questions

How much is an oversize permit in Ohio?

The single-trip base is $20, before the dimension bands, the overweight component and the transaction charge. The base alone is rarely what is paid.

When does Ohio require a pilot car?

The first width trigger is 13' or more.

What is a superload in Ohio?

Ohio's published gross-weight superload line is over 120,000 lb. It is not 80,000 lb; that is the federal legal gross limit, not a superload threshold.

↑ Back to the contents